Be A Global Experts

Ozan KAYMAK

Waste management and Water Treatment CCPP Power Plants

Antalya,Turkey

15 years of total experience in the fields of solid waste and waste management projects

Education


  • 2000 - Bachelor’s Degree in Civil Engineering , Pamukkale University

Experience


Technical Assistance for the Supervision of Construction of Ordu Waste Water Treatment Plant (WWTP) and Retrofitting of Kumbasi WWTP Contract Number: EuropeAid/128730/D/SER/TR 2008TR16IPR002.1.01/SER/02 and Construction of Ordu Sewerage and Water Supply System 2008TR16IPR002-03/WKS/38 Fidic Based

Balakhani Rehabilitation of Waste Disposal Site; material approval, method statements, daily-monthly reports, variation orders, interim payment certificates, minutes of meetings, request for inspections, notice of works, FIDIC based World Bank Project, subconstruction works, rain water channels. Fidic Based European Union Project in Diyarbak?r-Turkey

Enerjisa-Siemens Bandirma II CCPP Monthly Invoices, Daily and Monthly Site Reports, Work Schedules, Method of Statements

Fidic Based Project Request for Inspections, Claims, Variation Orders, Daily Site Reports, Monthly Progress Reports, Material Approvals, Design Presentations, Interim Payment Certificates, Subconstruction works, Storm water channels.

Fidic Based Construction of Kütahya Solid Waste Management Project-Landfill; Clay works; Geomembrane; Geotextile works; steel and reinforced concrete buildings; civic amenity centers; pipelines, roads, open channels, asphalt pavement etc. Kayseri-Sivas road 6+000-62+224 km's subbase and base works, asphalt pavement works. Isparta-Burdur Road 16+000-34+000 km's subbase and base works, asphalt pavement works, trapezoidal rain water channels.

Fidic Based Construction of Çanakkale Solid Waste Management Project (Landfill; Clay works; Geomembrane; Geotextile works; steel and reinforced concrete buildings; creek design; civic amenity centers; rehabilitations; pipelines, roads, open channels, side slope riser; Leachate Treatment Plant; Storm water channels; asphalt pavement etc.)

Polyplex Europa Factory Construction Daily Site Reports, Monthly Progress Reports, Material Approvals, Work Schedules, Contracting, Interim Payment Certificates,

TÜPRA? Coordinate&Controlling the structural and substructural works on field depends of project. Procuring the required material on field for using by site team depends of our work plan. Uphold the Health&Safety rules.

Coordinate to working plan (Trade Center Construction Site, 8 Floors) Coordinate&controlling to substructure constructions (waste water lines, storm water lines, roads, culvert design) and all building facilities. (162 expensive detached houses)